LEXUS RX 300

1998-2003 of release

Repair and car operation



Lexus RX 300
+ Cars Lexus RX-300
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
- Automatic transmission and interaxal differential
   The general information
   Search of malfunctions - the general information
   Replacement of gauges
   Removal and installation of assemblage of valves AT
   Checks and adjustments АТ
   Removal and installation of cooler ATF
   Removal and installation of assemblage of the lever of the selector of modes АТ
   Removal and installation АТ
+ Transmissionnaja line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Basic schemes of electric connections




Replacement of gauges

Gauges of speed

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the storage battery.
  2. Remove air cleaner assemblage (see the Head of the Power supply system and release of the fulfilled gases).
  3. Separate sockets of electroconducting of the gauge of entrance turns of the hydrotransformer and the gauge of speed of a secondary gear wheel, turn out bolts of fastening of gauges and remove gauges.
  1. The gauge of entrance turns of the hydrotransformer
  1. The gauge of speed of a secondary gear wheel
  1. Establish new gauges together with new sealing rings and tighten bolts of fastening of gauges with effort of 11 Nanometers.

The gauge of temperature ATF

 PERFORMANCE ORDER

  1. Remove assemblage of valves (see Has undressed Removal and installation of assemblage of valves AT).
  1. Separate an electroconducting socket э/м the valve, turn out a bolt, remove a wire of the valve and remove the gauge of temperature ATF.
  1. Establish the new gauge, tighten a fixing bolt with effort of 5.4 Nanometers and connect electroconducting.

The gauge-switch of modes «P» / «N»

 PERFORMANCE ORDER

  1. Remove the bottom protective casing of an impellent compartment.
  1. Separate a socket of electroconducting Д/В of modes «P» / »N». Give nuts, remove a washer and the lever of draught of switching of modes.
  1. Wring out a lock plate, turn out the bottom nut and remove a lock plate.
  1. Turn out bolts of fastening Д/В of modes «P» / «N» and remove the gauge-switch.
  1. Establish new Д/В and tighten bolts of its fastening with effort of 5.4 Nanometers.
  2. Tighten the bottom nut with effort of 6.9 Nanometers and fix its lock washer, having bent its edges.
  3. Tighten the top nuts with demanded efforts and join a gauge socket.
  4. Check up that the engine is started only at established in position «P» or «N» selector AT lever. If necessary adjust Д/В (the Check and adjustment АТ Section see).
  5. Establish assemblage of an air cleaner and the bottom protective casing of an impellent compartment.