LEXUS RX 300

1998-2003 of release

Repair and car operation



Lexus RX 300
+ Cars Lexus RX-300
+ Controls and operation receptions
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ The power supply system and release of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Transmissionnaja line
- Brake system
   The general information and security measures
   Removal, installation and check of pedals of brake system
   Check of brake system through a socket of the module of management
   Removal and installation of the tank and the main brake cylinder (ГТЦ)
   Removal, check and installation of the amplifier of brakes
   Replacement brake pads
   Removal, dismantling, check, assemblage and installation of supports of brake mechanisms
   Dismantling, check and assemblage of a lay brake
   Check of the valve of distribution of brake effort
   Removal and installation of the activator of brakes
   Removal and installation of wheel gauges
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Basic schemes of electric connections




Removal and installation of the activator of brakes

Components of installation and activator assemblage

1 — Broad tank ОЖ
2 — activator Assemblage
3 — Tube ГУР
4 — the Activator

5 — the Holder
6 — the Lining
7 — Loker of the right forward wheel arch
8 — the Arm of fastening of the activator


 PERFORMANCE ORDER

  1. Remove the right forward wheel and локер its arches.
  2. Turn out a bolt of fastening of the holder of tube ГУР.
  3. Shift forward broad tank ОЖ and remove it to the holder.
  4. Separate 4 socket and disconnect hoses from the activator of brakes.
  5. Disconnect from assemblage of the activator of brakes of 6 brake tubes.
  6. Turn out two bolts and a nut and remove activator assemblage.
  7. Turn out two nuts and remove the activator from an arm.
  8. Remove from the activator two holders and three linings.
  9. Installation is made upside-down.
  10. After installation fill tank GTTS with a brake liquid and pump over brake system (the Section Replacement of a brake liquid, prorolling of brake system see).